Redlands Primary School

Installation Type:
Rooftop Solar
System Size:
100kW
12 Month Savings:
$25,600
Payback Time:
3 - 4 Years
solar-hero-image

Evergreen Electrical partnered with Redlands Primary School to deliver a 100 kW rooftop solar PV system, reducing the school’s reliance on grid energy and showcasing renewable energy in action for its students and community.

The system was installed and grid-connected in November 2023. Since then, it has consistently delivered strong energy generation, cost savings, and environmental benefits.

Key Project Details

  • System Size: 100 kW rooftop solar PV
  • Panels: 240 × Canadian Solar HiKu 415 W modules
  • Inverters: 2 × Sungrow SG50CX Premium (50 kW each)
  • Mounting: Sunlock racking system (tin roof)

12 Month Performance

  • Consumption Supplied by Solar: ~48% of demand (152 MWh in first 6 months, continuing similar trend)
  • Revenue/Savings: ~$25,600 AUD
  • System Efficiency: Consistently >97%

Sustainability Impact

  • 118.6 tonnes of CO₂ avoided
  • Equal to saving 48 tonnes of coal
  • Equivalent to planting 6,474+ trees

Outcomes & Benefits

Lower Energy Bills – Nearly half of the school’s energy demand is solar supplied.

Community Education – Students learn about renewable energy by seeing it in action daily.

Sustainability Leadership – Redlands sets a benchmark for schools across Queensland.

Future-Proofing – Long-term energy savings support reinvestment back into education.